MENU

EARTHWORK PLAN APPROVAL / STREET LIGHTING / ROAD AND DRAINAGE APPLICATION

GENERAL INFORMATION OF APPROVAL APPLICATION FOR EARTH WORK/ STREET LIGHTING/ ROAD AND DRAINAGE

image Earth that dropped into public drains need to be cleared at all times.
image Cut and refilled land need to be leveled neatly
image Access roads across public drains need to be built on concrete culvert to avoid obstructions to drain's water
 flow.
image "WASHING PIT" and "WATER PRESSURE JET" facilities shall be provided to clean lorry's tires before going
  onto public roads and to clean public roads.
image Waterways that flows into public drains must be fitted with "silt trap"made of sand bags
image Standard signboards such as "CAUTION", "LORRY CARRYING EARTH IN FRONT", "SLOW" and others
  needed to be sufficiently displayed at every vehicular access roads.
image You are required to furnish the council with the list of lorries registration numbers used.
image All dirt falling off your lorries must be immediately clean satisfactorily.
image Council shall not be liable for any form of accidents during transporting work
image All vehicles used for transportation works shall be in a good working condition and conformed
  to JPJ standards
image Vehicles used for this purpose shall not overload and shall be covered properly with 'CANVAS'.
image Information on project's name, suppliers, owner's name, and others shall be stated on the signboard
  at the project site
image Any damages, defaced, or adversely effected to Council's properties shall be Council. If the Council
  is not satisfied with the repair/reinstatement , we shall repair/reinstate repaired/reinstated immediately
  to the satisfactory of the it ourselves and the cost will be charged to your company.
image You bounded by the Council's by-laws and are required to comply to it from time to time.

Procedures Download Form

 

<< Back